How Does Kao Lu Develop New Products? NPI Gates G0–G5, Cross-Functional DCP Decisions and an 8D R&D Knowledge Base

Published: 2026-11-28 | Last updated: 2026-11-28

NPI (New Product Introduction) is a staged process that takes a product idea from concept to production, with a gate at the end of each stage where a cross-functional decision meeting decides whether to proceed. Under the 2025 (ROC year 114) CITD enterprise innovation methodology programme of Taiwan's Industrial Development Administration, Kao Lu Enterprise Co., Ltd. (brand: Kao Lu) worked with China Productivity Center consultants to establish a six-gate G0–G5 NPI process, cross-functional project teams and Decision Check Point (DCP) meetings, and built a RAG retrieval prototype on the company's historical 8D reports. This article explains how a Kao Lu product goes from a customer requirement to a shippable proportional pressure regulator, and what that process means for customers.

Why would a 40-year proportional valve maker introduce NPI?

Kao Lu has developed and manufactured I/P and E/P electro-pneumatic proportional valves since 1980, with software, hardware, firmware and mechanics all in-house. That vertical integration means any custom request can be done internally; the cost is that as the range grew to proportional pressure regulators (vacuum to 100 bar), proportional flow control valves (18–200,000 L/min), pinch valves and flow meters, the linear "R&D finishes, sales takes over" model showed three gaps: market need was not quantified before development, manufacturing and QA saw drawings only after design freeze, and past failure experience sat in departmental 8D reports that nobody searched. The 2025 CITD programme set out to make those three things part of the process.

Kao Lu NPI new product introduction flow: six gates G0 opportunity to G5 launch, cross-functional DCP decision review and 8D reports feeding the RAG R&D knowledge base
Figure 1: The six NPI gates (G0–G5), cross-functional DCP decisions and the 8D loop back into the knowledge base.

What does each of the six gates G0–G5 decide?

GateStageQuestion answered at this gateKey outputs
G0IdeaIs this requirement worth a project?Requirement statement, initial market size, fit with current range
G1FeasibilityTechnically achievable and commercially worthwhile?STP positioning, target specification, competitor cross-reference, initial cost
G2DesignDoes the design meet the target specification?Mechanical drawings, schematics, firmware architecture, DFMEA, critical parts list
G3Prototype validationDo prototype measurements meet spec?Accuracy, hysteresis, repeatability, response and accelerated-life test reports
G4Pilot runCan the process make the same thing consistently?Pilot-lot Cpk, assembly time, fixtures, inspection standards
G5Production releaseReady to take orders and ship?Production BOM, datasheet, ISO 13485 documentation, after-sales support material

Each gate is decided at a DCP meeting: pass, revise and re-review, hold, or terminate. The meeting always includes R&D, manufacturing, sales and QA, and any one of them can call a stop — the biggest change from before, when a product was effectively an R&D decision.

How does the cross-functional project team work?

At G0 each NPI project names a project lead and a representative from each of the four departments. R&D owns design and validation, manufacturing owns manufacturability and fixtures, sales owns market feedback and target customers, QA owns inspection standards and ISO 13485 documentation. All four are involved from G1, not brought in after design freeze at G2. For a customer it means a custom requirement has been assessed by manufacturing and QA at project start, and the delivery commitment is backed by four departments rather than one engineer.

How did 8D reports become an R&D knowledge base?

Kao Lu's accumulated 8D reports (complaint analysis and corrective action) were filed by case and never consulted during new development. The programme structured them into a RAG (Retrieval-Augmented Generation) retrieval prototype: at the G2 design stage an engineer enters keywords such as "diaphragm material", "coil temperature rise" or "M12 connector water ingress" and the system returns related past failure modes, root causes and countermeasures. New designs can therefore reference real field failure data at the DFMEA stage rather than relying on individual memory.

What does this process mean in practice for customers?

  • Custom specifications have a basis: G1 target specifications come from STP analysis and quantified customer need, not estimates.
  • Datasheet figures have test reports behind them: G3 accuracy, hysteresis, repeatability and response are measured on prototypes; ±0.25% F.S. on the datasheet is a measured value, not a design target.
  • Production consistency has Cpk: G4 pilot-lot process capability decides release, not "it works".
  • Failure experience is not repeated: the 8D knowledge base keeps the same class of problem from recurring on a new product.
  • ISO 13485 documentation is produced in step: at G5 the datasheet, inspection standards and traceability records are complete, ready for a medical-device customer's supplier audit.

Frequently asked questions

Are NPI and Stage-Gate the same thing?

NPI is the overall task of taking a new product from concept to production; Stage-Gate is one method of running NPI — dividing the work into stages with a gate at the end of each, decided by a review meeting. Kao Lu's NPI uses a Stage-Gate structure; G0–G5 are its six gates.

Do custom products go through G0–G5 too?

Yes, scaled to the degree of customisation. A variant that only changes pressure range or signal interface can go from G2 straight to G3; a new mechanism or new material runs the full process.

Is the 8D knowledge base open to customers?

No. 8D reports contain customer information, so the base is for internal R&D and QA use only. Customers can ask during selection about known considerations for a specific application, and an engineer will consult the base and reply.

Is the process still in use after the CITD programme ended?

Yes. The programme's purpose was to build the process, not run one project. G0–G5 and DCP meetings are now standard operating practice; the high-flow proportional pressure regulator project funded under the 2026 CITD product development grant runs on this process.

How does this relate to ISO 13485?

ISO 13485 requires records of design and development planning, inputs, outputs, review, verification and validation. The outputs of each G0–G5 gate map onto those requirements, and DCP meeting minutes serve as the design review record.

Have a custom pressure or flow control requirement?

Send the medium, pressure or flow range, accuracy requirement, control signal and application, and the project team will assess feasibility through the NPI process and reply with a schedule and quotation. Request a Quote →

Related: About Kao Lu | 2025 CITD programme and the QKL-B4NR | 2026 CITD high-flow regulator project | SBIR voice-coil regulator

 2026-11-28